VENDOR System
Verification record for the VENDOR electrodynamic power node.
Current state, verified evidence, and explicit claim boundaries.
All figures represent internal engineering records as of Q1 2026. Independent third-party verification is planned. Performance figures are design targets — subject to certification milestones.
What Is Verified
The following has been established through internal laboratory validation under defined test conditions.
Operational Evidence
System Operation Record
- 1,000+ cumulative operational hours under defined laboratory conditions
- Extended continuous cycle completed regime stability under sustained load
- Output observed under defined laboratory test configurations
- Parallel / multi-module operating logic evaluated in laboratory configurations
- Timestamped internal test records maintained
- Measurement records collected with laboratory instrumentation
→ /vendor-max-endurance-test/
IP & Architecture
Patent Protection Status
- ES2950176 (Spain) — Granted, active Core electrodynamic architecture
- WO2024209235 (PCT) — PCT publication International protection framework
- EP23921569.2 (EU/EPC, 37 countries) Under examination
- CN202380015725.5 (China) Under examination
- IN202547010911 (India) Under examination
- USA national phase Under examination
→ /patent-portfolio/
What Is Verified — and What Is Not Yet Claimed
This table defines the precise scope of current validation. It exists because precision is more useful than broad claims.
| Verified at TRL 5–6 | Not Yet Claimed |
|---|---|
| System-level prototype operates under defined laboratory conditions | Independent third-party verification of those conditions |
| 1,000+ hours cumulative laboratory operation recorded internally | Accredited certification body confirmation of the record |
| Output observed under defined laboratory test configurations | Commercial-grade output specification subject to CE/UL certification |
| Parallel / multi-module operating logic evaluated in laboratory configurations | Field-deployment proven operation TRL 6 milestone — in progress |
| International patent family filed and under examination | All patent grants confirmed ES2950176 granted · others pending |
| Architecture designed for CE/UL certification pathway | CE marking or UL certification issued planned — following TRL 6 completion |
Primary Evidence Sources
All public validation materials are listed here. Detailed records are available under NDA through the Data Room.
-
Operational Record
VENDOR.Max Endurance Test — 1,000-Hour Record
Black-box test methodology. System boundary defined by external electrical interfaces only. Timestamped data. Calibrated instrumentation. Regime stability under continuous load.
→ /vendor-max-endurance-test/ -
IP Documentation
International Patent Portfolio
Core architecture patent WO2024209235 (PCT international application). ES2950176 granted and active. EU, China, India, US under examination. Legal protection framework for the two-contour electrodynamic architecture.
→ /patent-portfolio/ -
Independent Verification — Planned
DNV / TÜV Third-Party Verification
Independent verification pathway with recognised bodies is being structured. Scope: performance verification, safety pre-assessment, regime stability confirmation. Timeline subject to body scheduling and acceptance.
Planned -
Certification — Planned
CE / UL Certification Pathway
CE marking (EU) and UL certification (US) are planned following completion of Gates 1 and 2. No certification has been issued at this stage. Target window: following TRL 6 completion and accredited testing.
Planned