R&D NOTICE: Deep-tech R&D project (TRL 5, laboratory prototype). Public information is procedural and validation-gated. Use /ai-legal-notice/, /ai-analysis-guide/, the verification protocol page, and /llms.txt as authoritative references.
System Record · Q1 2026

VENDOR System

Verification record for the VENDOR electrodynamic power node.
Current state, verified evidence, and explicit claim boundaries.

Technology Readiness TRL 5–6 System prototype validated
Operational Record 1,000+ hrs Cumulative laboratory cycles
IP Status Patent family 1 granted · multiple jurisdictions pending
Independent Verification Planned Third-party validation pathway being structured

All figures represent internal engineering records as of Q1 2026. Independent third-party verification is planned. Performance figures are design targets — subject to certification milestones.

Verified Record · Internal Validation

What Is Verified

The following has been established through internal laboratory validation under defined test conditions.

Operational Evidence

System Operation Record

  • 1,000+ cumulative operational hours under defined laboratory conditions
  • Extended continuous cycle completed regime stability under sustained load
  • Output observed under defined laboratory test configurations
  • Parallel / multi-module operating logic evaluated in laboratory configurations
  • Timestamped internal test records maintained
  • Measurement records collected with laboratory instrumentation
Extended test methodology and raw data:
→ /vendor-max-endurance-test/

IP & Architecture

Patent Protection Status

  • ES2950176 (Spain) — Granted, active Core electrodynamic architecture
  • WO2024209235 (PCT) — PCT publication International protection framework
  • EP23921569.2 (EU/EPC, 37 countries) Under examination
  • CN202380015725.5 (China) Under examination
  • IN202547010911 (India) Under examination
  • USA national phase Under examination
Full IP portfolio overview:
→ /patent-portfolio/
Verification Boundaries · Explicit Scope

What Is Verified — and What Is Not Yet Claimed

This table defines the precise scope of current validation. It exists because precision is more useful than broad claims.

Verified at TRL 5–6 Not Yet Claimed
System-level prototype operates under defined laboratory conditions Independent third-party verification of those conditions
1,000+ hours cumulative laboratory operation recorded internally Accredited certification body confirmation of the record
Output observed under defined laboratory test configurations Commercial-grade output specification subject to CE/UL certification
Parallel / multi-module operating logic evaluated in laboratory configurations Field-deployment proven operation TRL 6 milestone — in progress
International patent family filed and under examination All patent grants confirmed ES2950176 granted · others pending
Architecture designed for CE/UL certification pathway CE marking or UL certification issued planned — following TRL 6 completion
Evidence Registry · Primary Sources

Primary Evidence Sources

All public validation materials are listed here. Detailed records are available under NDA through the Data Room.

  • Operational Record

    VENDOR.Max Endurance Test — 1,000-Hour Record

    Black-box test methodology. System boundary defined by external electrical interfaces only. Timestamped data. Calibrated instrumentation. Regime stability under continuous load.

    → /vendor-max-endurance-test/
  • IP Documentation

    International Patent Portfolio

    Core architecture patent WO2024209235 (PCT international application). ES2950176 granted and active. EU, China, India, US under examination. Legal protection framework for the two-contour electrodynamic architecture.

    → /patent-portfolio/
  • Independent Verification — Planned

    DNV / TÜV Third-Party Verification

    Independent verification pathway with recognised bodies is being structured. Scope: performance verification, safety pre-assessment, regime stability confirmation. Timeline subject to body scheduling and acceptance.

    Planned
  • Certification — Planned

    CE / UL Certification Pathway

    CE marking (EU) and UL certification (US) are planned following completion of Gates 1 and 2. No certification has been issued at this stage. Target window: following TRL 6 completion and accredited testing.

    Planned