R&D NOTICE: Deep-tech R&D project (TRL 5, laboratory prototype). Public information is procedural and validation-gated. Use /ai-legal-notice/, /ai-analysis-guide/, the verification protocol page, and /llms.txt as authoritative references.
VENDOR Technology Program · R&D Support

R&D Support Layer

Voluntary Participation in Engineering Development Processes

NOT

This page is not a crowdfunding campaign.

NOT

It is not a donation drive.

It is a structured interface for voluntary support of ongoing engineering development and validation processes within the VENDOR technology program — autonomous electrodynamic power node architecture protected under patent WO2024209235 (PCT), validated at TRL 5–6 with over 1,000 cumulative operational hours.

NOT

an investment or financial instrument

NOT

a product purchase or preorder

NOT

a promise of future financial benefit

Voluntary support for a specific engineering process with defined milestones and measurable outputs.

System context: This interface exists alongside structured pilot programs, strategic evaluation pathways, and institutional investment processes. It complements — but does not replace — those engagement tracks.

This interface was introduced following repeated informal requests from engineers, operators, and external observers asking for a structured way to participate in the development process.

These requests did not relate to investment or commercial access, but to direct support of ongoing engineering work at the laboratory level. Until now, no such mechanism existed publicly.

This page provides a formalized, transparent, and non-commercial way to support defined R&D activities without altering pilot programs, validation protocols, or institutional investment pathways.

TRL Progression · Operational Requirements

What Requires Resources
at This Stage

The transition from TRL 5–6 toward certification readiness is not abstract progress. It is a sequence of concrete physical expenditures: measurement hardware, test stands, safety equipment, component batches, and continuous laboratory operations.

Institutional financing

Typically covers the strategic layer — capital rounds, certification milestones, and manufacturing scale pathways.

Voluntary contributions

Cover operational needs at the current stage — directly, without administrative delay, going straight into the laboratory.

TRL Expenditure Map
Stage Engineering Task What Requires Resources
TRL 5–6 Laboratory validation and regime stability Measurement hardware, consumables, component batches
TRL 6–7 Extended endurance testing and measurement cycles Test stands, data acquisition systems, component replacement cycles
TRL 7–8 Pilot deployment and certification pathway CE / UL / ISO procedures, field-ready prototypes, safety equipment

Every operational laboratory cycle advances the system along its validation path. Supporting that cycle is a direct contribution to a defined engineering outcome.

Contribution Structure · Allocation & Transparency

How Support Is Allocated

All received contributions are directed exclusively toward the technology.

NO

Salaries

NO

Marketing

NO

Administrative overhead

Expenditure Categories

Laboratory equipment

Measurement instruments, oscilloscopes, spectrum analyzers

Materials & components

Component batches for validation protocols

Certification procedures

CE / UL / ISO preparation and processing

Testing equipment

Test stands, safety systems, specialized tooling

Prototype maintenance

Sustaining operational readiness of active prototypes

Consumables

Components for TRL validation cycles


Full Transparency on Fees and Taxes

When processed through PayPal, mandatory deductions apply to each contribution:

PayPal transaction fee

3–7% depending on region and currency

Corporate income tax (Romania)

16% applied to incoming funds — withheld and remitted to ANAF in full compliance with Romanian fiscal regulations

100%

After mandatory fiscal deductions, all remaining funds are directed exclusively to the expenditure categories listed above.

MICRO DIGITAL ELECTRONICS CORP S.R.L.

·

CUI 50047468

·

Romania, EU

·

Fully legal, fully traceable structure


Public Expenditure Audit

All purchases are documented and published in the official VENDOR Telegram channel:

Invoices

Receipts

Photographs of delivered equipment

Testing reports

These records are supplementary and do not replace formal documentation used in certification and institutional reporting processes.

➝ t.me/vendorenergy
Voluntary Participation · Four Tiers

R&D Participation Tiers

All tiers are voluntary, non-binding symbolic gestures of support. Participation does not grant equity, governance rights, financial returns, or guaranteed product delivery. VENDOR reserves the right to modify or discontinue any tier at any time without obligation.

Tier 1

€100

Development Participant

  • Optional name listing on the Supporters Wall in the official VENDOR Telegram channel
  • Priority updates on laboratory procurement and validation progress
Participate →

You will be redirected to PayPal to complete the voluntary participation process.

Tier 2

€500

Confirmed Participant

  • Official named certificate of participation in the development of autonomous solid-state energy technology
  • Printed and signed, delivered by post worldwide
  • Symbolic recognition — not equity, not a preorder, not a contract
Participate →

You will be redirected to PayPal to complete the voluntary participation process.

Tier 3

€2,500

Early Testing Participant

  • Eligibility to be considered for early volunteer testing participation, subject to technical readiness, safety protocols, and geographic availability
  • Notification when testing groups are formed
This is not a guaranteed hardware delivery. Testing is voluntary and conducted under defined safety protocols.
Participate →

You will be redirected to PayPal to complete the voluntary participation process.

Tier 4

€10,000

External Development Group Participant

  • Eligibility to be considered for participation in a private external development discussion group, subject to review and approval
  • Where participation is approved, the format may include extended updates, direct Q&A with the engineering team, and possible involvement in contributor-level work streams
No voting rights, no governance influence, no financial return. This is a participation forum for engineers and builders who share the direction of this project.
Participate →

You will be redirected to PayPal to complete the voluntary participation process.

For voluntary support above €10,000, please contact the team directly before initiating payment.

All tiers are non-binding symbolic gestures of support. Participation does not grant equity, governance rights, financial returns, or guaranteed product delivery.

Voluntary Participation · Support the Development

Support the Development

If you share the direction of this work and wish to support a specific engineering process — select a participation tier and continue via PayPal.

€100

Development Participant

Participate →

€500

Confirmed Participant

Participate →

€2,500

Early Testing Participant

Participate →

€10,000

External Development Group Participant

Participate →

All contributions are processed through PayPal. Standard transaction fees and mandatory tax deductions apply as described above.


About the Project

About the Project

VENDOR develops autonomous electrodynamic power node architecture for infrastructure deployment — systems designed to operate in environments constrained by limited grid access, without fuel-based logistics, and without dependence on battery cycling.

The architecture is protected under patent WO2024209235 (PCT) and ES2950176 (granted, Spain).

TRL 5–6

Validation stage

1,000+

Cumulative operational hours

532 h

Continuous validation cycle

2

Patents (PCT + granted, Spain)

If you support this process — you support defined engineering systems, validation protocols, and a structured certification pathway.

Thank you for your participation.