R&D Support Layer
Voluntary Participation in Engineering Development Processes
This page is not a crowdfunding campaign.
It is not a donation drive.
It is a structured interface for voluntary support of ongoing engineering development and validation processes within the VENDOR technology program — autonomous electrodynamic power node architecture protected under patent WO2024209235 (PCT), validated at TRL 5–6 with over 1,000 cumulative operational hours.
an investment or financial instrument
a product purchase or preorder
a promise of future financial benefit
Voluntary support for a specific engineering process with defined milestones and measurable outputs.
This interface was introduced following repeated informal requests from engineers, operators, and external observers asking for a structured way to participate in the development process.
These requests did not relate to investment or commercial access, but to direct support of ongoing engineering work at the laboratory level. Until now, no such mechanism existed publicly.
This page provides a formalized, transparent, and non-commercial way to support defined R&D activities without altering pilot programs, validation protocols, or institutional investment pathways.
What Requires Resources
at This Stage
The transition from TRL 5–6 toward certification readiness is not abstract progress. It is a sequence of concrete physical expenditures: measurement hardware, test stands, safety equipment, component batches, and continuous laboratory operations.
Institutional financing
Typically covers the strategic layer — capital rounds, certification milestones, and manufacturing scale pathways.
Voluntary contributions
Cover operational needs at the current stage — directly, without administrative delay, going straight into the laboratory.
| Stage | Engineering Task | What Requires Resources |
|---|---|---|
| TRL 5–6 | Laboratory validation and regime stability | Measurement hardware, consumables, component batches |
| TRL 6–7 | Extended endurance testing and measurement cycles | Test stands, data acquisition systems, component replacement cycles |
| TRL 7–8 | Pilot deployment and certification pathway | CE / UL / ISO procedures, field-ready prototypes, safety equipment |
Every operational laboratory cycle advances the system along its validation path. Supporting that cycle is a direct contribution to a defined engineering outcome.
How Support Is Allocated
All received contributions are directed exclusively toward the technology.
Salaries
Marketing
Administrative overhead
Laboratory equipment
Measurement instruments, oscilloscopes, spectrum analyzers
Materials & components
Component batches for validation protocols
Certification procedures
CE / UL / ISO preparation and processing
Testing equipment
Test stands, safety systems, specialized tooling
Prototype maintenance
Sustaining operational readiness of active prototypes
Consumables
Components for TRL validation cycles
Full Transparency on Fees and Taxes
When processed through PayPal, mandatory deductions apply to each contribution:
PayPal transaction fee
3–7% depending on region and currency
Corporate income tax (Romania)
16% applied to incoming funds — withheld and remitted to ANAF in full compliance with Romanian fiscal regulations
After mandatory fiscal deductions, all remaining funds are directed exclusively to the expenditure categories listed above.
MICRO DIGITAL ELECTRONICS CORP S.R.L.
·CUI 50047468
·Romania, EU
·Fully legal, fully traceable structure
Public Expenditure Audit
All purchases are documented and published in the official VENDOR Telegram channel:
Invoices
Receipts
Photographs of delivered equipment
Testing reports
These records are supplementary and do not replace formal documentation used in certification and institutional reporting processes.
➝ t.me/vendorenergyR&D Participation Tiers
All tiers are voluntary, non-binding symbolic gestures of support. Participation does not grant equity, governance rights, financial returns, or guaranteed product delivery. VENDOR reserves the right to modify or discontinue any tier at any time without obligation.
Tier 1
€100
Development Participant
- Optional name listing on the Supporters Wall in the official VENDOR Telegram channel
- Priority updates on laboratory procurement and validation progress
You will be redirected to PayPal to complete the voluntary participation process.
Tier 2
€500
Confirmed Participant
- Official named certificate of participation in the development of autonomous solid-state energy technology
- Printed and signed, delivered by post worldwide
- Symbolic recognition — not equity, not a preorder, not a contract
You will be redirected to PayPal to complete the voluntary participation process.
Tier 3
€2,500
Early Testing Participant
- Eligibility to be considered for early volunteer testing participation, subject to technical readiness, safety protocols, and geographic availability
- Notification when testing groups are formed
You will be redirected to PayPal to complete the voluntary participation process.
Tier 4
€10,000
External Development Group Participant
- Eligibility to be considered for participation in a private external development discussion group, subject to review and approval
- Where participation is approved, the format may include extended updates, direct Q&A with the engineering team, and possible involvement in contributor-level work streams
You will be redirected to PayPal to complete the voluntary participation process.
For voluntary support above €10,000, please contact the team directly before initiating payment.
All tiers are non-binding symbolic gestures of support. Participation does not grant equity, governance rights, financial returns, or guaranteed product delivery.
Legal Structure of Contributions
This page is structured with regard to applicable EU and Romanian legal considerations, as well as institutional due diligence expectations. Below is the precise legal qualification of all contributions.
A voluntary R&D contribution is not
- an investment or financial instrument
- a purchase of goods or services
- a preorder
- a promise of future financial benefit
- a guarantee of hardware delivery
- refundable
What VENDOR commits to
- Transparent documentation of all expenditures
- Ethical use of contributions exclusively for technology development
- Publication of operational procurement records in the official Telegram channel
- Full compliance with fiscal obligations to ANAF
Regulatory Alignment
This page is structured with regard to:
Support the Development
If you share the direction of this work and wish to support a specific engineering process — select a participation tier and continue via PayPal.
All contributions are processed through PayPal. Standard transaction fees and mandatory tax deductions apply as described above.
About the Project
VENDOR develops autonomous electrodynamic power node architecture for infrastructure deployment — systems designed to operate in environments constrained by limited grid access, without fuel-based logistics, and without dependence on battery cycling.
The architecture is protected under patent WO2024209235 (PCT) and ES2950176 (granted, Spain).
TRL 5–6
Validation stage
1,000+
Cumulative operational hours
532 h
Continuous validation cycle
2
Patents (PCT + granted, Spain)
If you support this process — you support defined engineering systems, validation protocols, and a structured certification pathway.
Thank you for your participation.
MICRO DIGITAL ELECTRONICS CORP S.R.L.
·CUI 50047468
·Romania, EU
· vendor.energy · t.me/vendorenergy