News
VENDOR.Energy Begins Physical Verification of the VENDOR.Max Enclosure Before Manufacturing
VENDOR.Energy has begun full-scale physical verification of the VENDOR.Max enclosure using laboratory 3D printing to test PCB fit, connectors, cable routing, clearances…
Read
Assembly Begins on the Next VENDOR.Max Prototype Revision
VENDOR.Energy has begun physical assembly of the next VENDOR.Max prototype revision, built on a new component base and redesigned PCB architecture rather…
Read
VENDOR.Energy at the Japan–Romania Fusion Energy Platform: From Physics to a Common Scientific Language
VENDOR.Energy joined the Japan–Romania Fusion Energy Platform in Bucharest, where discussions on physics, deployment and measurement reinforced a methodological principle: begin with…
Read
VENDOR.Energy Begins Active Laboratory Rebuild as First Equipment Arrives
In May 2026, the VENDOR.Energy laboratory rebuild moved from planning into physical execution as the first measurement equipment, engineering tools and workstation…
Read
VENDOR.Energy Founder Invited to HPE Champions of Innovation at Davos 2026
VENDOR.Energy founder received a VIP invitation to HPE’s Champions of Innovation reception at USA House during Davos 2026.
Read
Energy Geopolitics, Capital Flows & the Future Power System at unDavos
At unDavos, VENDOR.Energy joined a panel on energy geopolitics, capital flows, infrastructure resilience and the architecture of future power systems.
Read
VENDOR.Energy Presents Decentralized Energy Infrastructure Vision in Davos
VENDOR.Energy presented in Davos a decentralized energy infrastructure model built around local generation, distributed capacity nodes and global coordination.
Read
VENDOR.Energy Begins the Next VENDOR.Max Revision on a New Component Base
Following the laboratory relocation, VENDOR.Energy chose not to simply rebuild the previous installation, but to move directly to the next VENDOR.Max revision…
Read
VENDOR Begins a New Development Phase Following Laboratory Relocation
Following the project relocation, VENDOR is rebuilding its engineering base and laboratory infrastructure for the next development stage of VENDOR.Max.
Read