Publications

News

28.08.2026

VENDOR.Energy Begins Physical Verification of the VENDOR.Max Enclosure Before Manufacturing

VENDOR.Energy has begun full-scale physical verification of the VENDOR.Max enclosure using laboratory 3D printing to test PCB fit, connectors, cable routing, clearances…

Read
06.08.2026

Assembly Begins on the Next VENDOR.Max Prototype Revision

VENDOR.Energy has begun physical assembly of the next VENDOR.Max prototype revision, built on a new component base and redesigned PCB architecture rather…

Read
18.06.2026

VENDOR.Energy at the Japan–Romania Fusion Energy Platform: From Physics to a Common Scientific Language

VENDOR.Energy joined the Japan–Romania Fusion Energy Platform in Bucharest, where discussions on physics, deployment and measurement reinforced a methodological principle: begin with…

Read
01.05.2026

VENDOR.Energy Begins Active Laboratory Rebuild as First Equipment Arrives

In May 2026, the VENDOR.Energy laboratory rebuild moved from planning into physical execution as the first measurement equipment, engineering tools and workstation…

Read
21.01.2026

VENDOR.Energy Technology Co-inventor Invited to HPE Champions of Innovation at Davos 2026

Vitaly Peretyachenko, co-inventor of the VENDOR.Energy technology, received a VIP invitation to HPE’s Champions of Innovation reception at USA House during Davos…

Read
20.01.2026

Energy Geopolitics, Capital Flows & the Future Power System at unDavos

At unDavos, VENDOR.Energy joined a panel on energy geopolitics, capital flows, infrastructure resilience and the architecture of future power systems.

Read
20.01.2026

VENDOR.Energy Presents Decentralized Energy Infrastructure Vision in Davos

VENDOR.Energy presented in Davos a decentralized energy infrastructure model built around local generation, distributed capacity nodes and global coordination.

Read
01.10.2025

VENDOR.Energy Begins the Next VENDOR.Max Revision on a New Component Base

Following the laboratory relocation, VENDOR.Energy chose not to simply rebuild the previous installation, but to move directly to the next VENDOR.Max revision…

Read
05.04.2025

VENDOR Begins a New Development Phase Following Laboratory Relocation

Following the project relocation, VENDOR is rebuilding its engineering base and laboratory infrastructure for the next development stage of VENDOR.Max.

Read